Selective rack installation from scissor lifts
Install

Installation

Our core work. Trained crews with the right tools and equipment install storage systems of every type, safely and on schedule.

Best for

New storage systems, installed plumb, level and anchored.

Installation is where the drawing becomes steel, and where most problems surface. Our crews work from laser layout, check plumb and level as frames go up, and torque anchors to the manufacturer’s requirements. Work zones are barricaded so your operation can keep running beside us.

Scope of work
  • Selective rack, push back and drive-thru systems
  • Pick modules and mezzanines
  • Shelving and mobile racks
  • Shuttle systems

What to expect

  1. Layout marked on the floor
  2. Frames set, plumbed and anchored
  3. Beams, decking and accessories installed
  4. Final inspection and handover

Every job also runs through our five project phases, from RFQ review to documented handover. How we work

BAY 14 · BEAMS SETTINGFRAMES PLUMBED + ANCHOREDLASER LAYOUT MARKEDISOMETRIC · INSTALL SEQUENCEFRAMES SET → PLUMB → ANCHOR → BEAMSTOLERANCE: 1/2" IN 10'-0" OUT OF PLUMBPRECISION WORKX · INSTALL SEQUENCEPROJECT PHASE03 OF 05SCALENTSDWGPW-1003
Sample install sequence. Illustrative drawing.
Covers
Selective rackPush backDrive-in / drive-thruPick modulesMezzaninesShelvingMobile racksShuttle systems

Project photos

Selective rack and wire deckingInstallation · Distribution

Selective rack and wire decking

Installing at height from a scissor liftInstallation · High-bay

Installing at height from a scissor lift

Request a quote

Send us your RFQ and we’ll come back with scope, schedule and pricing.